Blade EV support

Technical discussion for the Blade
Post Reply
EVC
Noobie
Posts: 1
Joined: Mon, 04 Mar 2013, 16:04
Real Name: Ross
Location: Chewton
Contact:

Blade EV support

Post by EVC » Sun, 01 Sep 2013, 15:15

Blade Electrons generally are not serviced on a regular basis so as time passes and things ware out or go wrong the cars naturally need a serious overhaul.

In the case of the old Azure controller there are no replacement power boards available world wide - so if the controller goes it means changing over to a new drive system such as the one from HPEVS - unless the cost of the excellent Tritium controller comes down. Would seriously like to see a group buy situation if it could be arranged.

I do have stocks of the original BMS cell boards for the battery monitoring if needed. Also I am considering making the original code Open Source and would like to know peoples thoughts on this.

As the old BMS units fail over time the replacement I use is the Orion BMS from Ewert. Happy to advise anyone who wants to go down that path.

Ross Blade

Ross Blade
CEO
Electric Vehicle Corporation Ltd
www.evcorporation.com.au

chris
Groupie
Posts: 53
Joined: Fri, 06 Feb 2009, 05:44
Real Name: chris
Location: sydney

Blade EV support

Post by chris » Sat, 07 Sep 2013, 23:15

Hi Ross how's the move to Sydney going?

Post Reply