Blade EV support

Technical discussion for the Blade
Post Reply
Posts: 1
Joined: Mon, 04 Mar 2013, 16:04
Real Name: Ross
Location: Chewton

Blade EV support

Post by EVC » Sun, 01 Sep 2013, 15:15

Blade Electrons generally are not serviced on a regular basis so as time passes and things ware out or go wrong the cars naturally need a serious overhaul.

In the case of the old Azure controller there are no replacement power boards available world wide - so if the controller goes it means changing over to a new drive system such as the one from HPEVS - unless the cost of the excellent Tritium controller comes down. Would seriously like to see a group buy situation if it could be arranged.

I do have stocks of the original BMS cell boards for the battery monitoring if needed. Also I am considering making the original code Open Source and would like to know peoples thoughts on this.

As the old BMS units fail over time the replacement I use is the Orion BMS from Ewert. Happy to advise anyone who wants to go down that path.

Ross Blade

Ross Blade
Electric Vehicle Corporation Ltd

Posts: 52
Joined: Fri, 06 Feb 2009, 05:44
Real Name: chris
Location: sydney

Blade EV support

Post by chris » Sat, 07 Sep 2013, 23:15

Hi Ross how's the move to Sydney going?

Post Reply